China's leading testing, inspection and certification company

Certification Services

Authorized by major institutions around the world, one-stop service for certification and testing

UL

UL is short for Underwriter Laboratories Inc. The UL Safety Laboratory is the most authoritative in the United States and the largest private institution engaged in safety testing and identification in the world. UL certification is a non-mandatory certification in the United States, mainly testing and certification of product safety performance. The entire U.S. market places great emphasis on product safety; more than 40,000 federal, state, county, and municipal governments in the U.S. all recognize the UL certification mark; Amazon USA also mandates that some products have UL certification.

Region: America
Skype/WhatsApp 0086-13712182081
More Introduction

1. Introduction of UL certification       

UL is short for Underwriter Laboratories Inc. The UL Safety Laboratory is the most authoritative in the United States and the largest private institution engaged in safety testing and identification in the world. UL certification is a non-mandatory certification in the United States, mainly testing and certification of product safety performance. The entire U.S. market places great emphasis on product safety; more than 40,000 federal, state, county, and municipal governments in the U.S. all recognize the UL certification mark; Amazon USA also mandates that some products have UL certification.

UL Mark

2. UL certification mark

For different types of UL services, UL marks can be divided into three categories, LISTED listing marks, Classified classification certification marks, and Recognize parts certification marks. UL's services are not only based on American UL standards, but also Canadian standards (cUL). As a result, UL marks are also divided into three types for UL products and cUL products, as well as for both. The "us" at the bottom right of the UL mark means it is suitable for the United States, the "c" at the bottom left means it is suitable for Canada, and both "us" and "c" are suitable for use in both countries. 

UL Certification Mark

 

3. UL certification common standards

product standard
Power supply 

UL62368-1/UL1310/UL1012/UL2056/

UL2089/UL458/UL697/UL60601-1

IT/AV

UL62368-1

Wireless

UL62368-1

Luminaires

UL1598/UL153/UL1786/UL1573/

UL588/UL2108/UL924/UL1993/UL8750

Batteries

UL1642/UL2054/UL2056/UL2271/UL2580/UL1973

Electric bike

UL2849/UL2272

Home appliance

UI1007/UL1005/UL1028/UL1083/UL982/UL1026

Industry transformer

UL1310/UL1012/UL506/UL1561/UL1562/

UL1585/UL1876/UL1411/UL397/UL697

p2p_picture 13_20211228100705

IT/AV/Power UL Certification Qualification

Picture 14_20211228100705

power supply UL certification qualification

医疗UL资质

Medical UL Certification Qualification

灯具UL资质

 Lighting UL Certification Qualification

电池UL资质

 Battery/Electric bike UL Certification Qualification

4. UL certification main test items:

1. Enter the test

2. Temperature rise test

3. Shock/drop test

4. Torque test

5. Ball pressure test

6.LPS limit power test

7. Touch current test

8. Ground impedance test

9. Constant temperature and humidity test

10. Failure testing, etc.

 

5. UL certification information provided

1. CDF (Critical Parts List)

2. Schematic

3.PCB Layout

4. Labels/Nameplates

5. Transformer specification, inductance specification

6. Model List/Difference Table

7. Instructions for use or installation of the product, etc.     

 

6. UL certification process

Process
Step 1:

Application

1. The customer fills in the UL application form;

2. Provide information such as battery specifications.

Step 2:

Quotation

Determine test time and cost based on the information provided.

Step 3:

Pay

After confirming the quotation, the applicant signs the application form and service agreement and pays the project fee.

Step 4:

Sample

The customer sends the sample.

Step 5:

Test

laboratory performs UL testing on the applied products according to UL related testing standards.

Step 6:

Report

The test passed and the report was completed.

Step 7:

Factory Inspection

The UL agency conducts a factory inspection of the application factory.

Step 8:

Certification

After the factory inspection, UL issued a UL certificate.

7.UL factory inspection:

UL audits the factory four times a year. In addition to the quarterly audit and the annual audit, the factory is also audited every year. The materials to be prepared for the UL audit are:
(1) Production and quality control procedures
(2) Inspection standards for main components and finished products
(3) Record of the certificate of main parts and components (yellow card)
(4) Material table of the product
(5) Main document of plastic material control
(6) Main document of production control
(7) Record of UL label
(8) Main parts and components Recycling of Packaging Bulk Label        

 


Global Testing, Great Quality

GTG specialists serve you one-on-one

0086-18188898539

Apply online, Free assessment of your exclusive certification scheme

Please fill in the true information and we will contact you within 24 hours!

*

*

*

Whatsapp
More Certifications
More
Certification Standards
Overview
Region
UL
UL
UL is short for Underwriter Laboratories Inc. The …
America
Apply
Amazon UL
Amazon UL
With the continuous improvement of Amazon's st…
America
Apply
CB
CB
The IECEE-CB system is a system for the global mut…
International
Apply
CCC
CCC
The full name of China's CCC certification is …
China
Apply
ETL
ETL
ETL is the abbreviation of Electrical Testing Labo…
America
Apply

WeChat

二维码Scan WeChat